Construction of 400kV Żydowo Kierzkowo - Słupsk Transmission Line, Construction of 400/110kV Żydowo Kierzkowo Substation with 220/110kV Transformer Installation, Poland
The project was signed on January 21th, 2014. This project is located in Szczecin Voivodeship, northwest of Poland. It is a key position for the Poland - Germany power grid interconnection. The projec...